#TM-9 V. TYPICAL WAREHOUSING OPERATIONS

#TM-9 V. TYPICAL WAREHOUSING OPERATIONS

Paragraf 2




ENGLISH

Receiving is the first operation in the warehouse. This process starts by notification of the arrival of goods. Then begins process of unloading, counting, identifying, quality control, and goods acceptance (incoming inspection) related to a type and quantity by unloading staff according to the company rules. When the goods are accepted, the receipt is issued. The acceptance depends on the delivery status – the delivery date, the quality of delivery, the planned schedule which should also minimize a truck waiting time.

INDONESIA

Menerima adalah operasi pertama di gudang. Proses ini dimulai dengan pemberitahuan kedatangan barang. Kemudian mulailah proses pembongkaran, penghitungan, pengidentifikasian, kontrol kualitas, dan penerimaan barang (inspeksi yang masuk) terkait dengan jenis dan kuantitas dengan menurunkan staf sesuai dengan aturan perusahaan. Ketika barang diterima, kwitansi diterbitkan. Penerimaan tergantung pada status pengiriman - tanggal pengiriman, kualitas pengiriman, jadwal yang direncanakan yang juga harus meminimalkan waktu tunggu truk.

KESIMPULAN

Receiving adalah kegiatan memperlakukan verifikasi dan identifikasi atas barang yang di terima berdasarkan dokumen seperti 
1. PO : PUCHASE ORDER (dokumen pembelian barang ) 
2. DN : DELIVERY NOTE (dikirim origin ke toko yang memesan ) 
3. DO/DN : DELIVERY ORDER (pemesan sama spt DN) 

hanya ada dalam satu SKU (STOCK KEEPING UNIT)
apa saya yang terdapat :
1. jenis barang                  6. status pengiriman
2. ukuran barang               7..kwitansi di terbitkan
3. masa berlakunya           8. Staging Area In : barang yang masuk ke gudang
4.tanggal pengiriman        9. best number , load number
5.kualitas pengiriman

Comments

Popular posts from this blog

#TM4-Manufering

#TM-1 WHAT ARE AN ORDER QUALIFIER AND AN ORDER WINNER?

# TM-2 Unloading activities at "our" plan